One element that has failed, measured against what the drawing and the standard required.
A defect investigation is assessed against the approved drawings and engineering for the property, the National Construction Code, the Guide to Standards and Tolerances 2017 and the relevant Australian Standard for the element in question.
0 checkpoints across 0 areas on a standard Box Hill defect investigation report. On a site under construction we need the lot open and the builder told we are attending. Where a stage is not complete we record that in the report rather than passing it.
Elements of one facade, recorded on a defect investigation in Box Hill.




New Construction Stage Inspections Seven checks through a Box Hill build, each timed before the work is closed in.
Pre-Handover (PCI) Inspections The final list while the last payment is still yours to hold.
Pre-Purchase Building Inspections A visual inspection to AS 4349.1 of the established homes around Box Hill.
Building and Pest Inspections One attendance covering both, with the pest findings kept in their own report. Instant online pricing, or talk to the booking team on 1300 471 805.
A defect report runs wide, cataloguing many items across an entire property. An investigation isolates a single failure and works out why it happened, which is the document you need when the argument is about fault rather than about whether the problem exists.
It is written so it could be, but the tribunal expects an expert witness report prepared to NCAT Procedural Direction 3, which we produce as a separate document. A good many disputes resolve earlier, because a clear investigation takes the facts off the table.
We set down what failed, and the requirement it failed against. Where the remedy needs structural or facade design that is an engineer's certificate, and the report says so rather than guessing at it.