Building a new home in Box Hill NSW

Box Hill was rezoned in 2013 under the North West Priority Growth Area and is planned to hold around 13,276 dwellings and roughly 42,480 residents at completion, on land bounded by Boundary Road, Annangrove Road, Old Pitt Town Road and Windsor Road. Fourteen or more estates are selling into that plan at once, which means trades follow each other closely. What we record is rarely poor workmanship so much as work closed in before it was finished: a bolt group short, a strap never tensioned, a membrane with pinholes in it.

Fully licensed & accredited

  • NSW Fair Trading NSW Fair Trading
  • Australian Society of Building Consultants Australian Society of Building Consultants
  • Strata Community Association Strata Community Association
  • Building Dispute Practitioners Society Building Dispute Practitioners Society

The precinct was rezoned in 2013 and is planned for about 13,276 dwellings.

At completion it is expected to house roughly 42,480 residents.

Gables was separated from the northern part of Box Hill in July 2020.

Steel beams and columns are common here, so the engineering detail matters at frame.

Send your engineering and tie down schedule before the inspection so the work is measured against your lot.

More about Box Hill

Written by our local inspection team from work carried out in Box Hill. Licensed building practitioners.

Guides

Guides for Box Hill owners and buyers

All guides →

Book a building inspection in Box Hill

Instant online pricing for Box Hill, or contact the booking team.

FAQ

Building a new home in Box Hill NSW: common questions

How many stages should I book?

Frame, waterproofing and handover at a minimum. Add lock-up if your build has complex services, because that is where damage done after the frame sign off still gets caught.

Is the builder entitled to knock back my inspector?

No standard NSW residential building contract gives them that right, and it is your property. Supervisors across these estates deal with independent inspectors routinely.

What notice period works best?

One or two days is enough, though earlier always helps. The exception is waterproofing, where the window between the membrane and the tiler can be as short as two days.