Box Hill Building
Inspections

What a pre-purchase inspection does not cover

The exclusions are why the inclusions can be relied on.

Box Hill 2765 · 17 June 2026

Fully licensed & accredited

  • NSW Fair Trading NSW Fair Trading
  • Australian Society of Building Consultants Australian Society of Building Consultants
  • Strata Community Association Strata Community Association
  • Building Dispute Practitioners Society Building Dispute Practitioners Society

In short: AS 4349.1 is a visual inspection, and everything it excludes it excludes for a reason.

The standard in a line

A visual inspection of readily accessible areas, reporting significant items, conditions conducive to structural damage and safety hazards.

Services are not tested

Electrical is not energised, plumbing is not pressure tested, appliances and heating are not run, motors are not operated.

Nothing is opened

No lining is removed, no ground excavated, no concealed framing or damp proof course exposed.

Separate scopes

Timber pests sit under AS 4349.3; asbestos and mould testing are specialist services outside both.

Why this helps you

A report clear about its boundaries can be relied on inside them. An inspection that overreaches is the one that collapses in a dispute.

Written by our local inspection team from work carried out in Box Hill. Licensed building practitioners.

Guides

More pre-purchase guides for Box Hill

All guides →

Book a building inspection in Box Hill

Instant online pricing for Box Hill, or contact the booking team.

FAQ

Questions Box Hill owners ask about this

Can I pay to have services tested?

Those are separate trades. An electrician or plumber can test, and the report says where that is worth doing.

Is a pest inspection included?

Not automatically. It is booked alongside as a combined building and pest job.

What if an area is obstructed?

It is recorded as not inspected with the reason. Silence about an area would be worse than a stated limitation.

Are safety hazards covered?

They are, and we keep them apart from the defect list because the timescale for acting on them differs.

Get a Free Quote